Costa Brava at DAMAC Lagoons

Catalan coast, the Adrenaline Hub

Costa Brava is the Catalan-themed cluster DAMAC called its Adrenaline Hub, launched in December 2021 around a large lagoon below the Central Hub. Both of its DLD phases reached 100% at inspection in 2026, and ready homes have been changing hands since April 2026.

Registered

1,052 units with DLD

Handover

Handovers under way since Apr 2026

Built

Both phases at 100%

DLD inspections: Costa Brava 1 on 9 Apr 2026, Costa Brava 2 on 3 Aug 2026.

Picture: Costa Brava townhouses, render by DAMAC.

Costa Brava townhouses with roof terraces, render by DAMAC

Costa Brava at a glance

Figures as of 3 Oct 2026, DLD open data (Dubai Land Department via Dubai Data), unless a row says otherwise.

Homes

1,052: 976 townhouses and 76 villas

Bedrooms

3, 4 and 5 bedroom townhouses; villas of 6 or 7 rooms in the DLD register

Built-up area

2,030 to 7,251 sq ft, plus one villa of 14,234 sq ft

Plot sizes

1,520 to 18,988 sq ft

Launched

Dec 2021

As of 6 Oct 2026. DAMAC payment plan (archived DAMAC website and launch sheet); news of 9 Dec 2021

Construction

Phase 1: 100% on 9 Apr 2026. Phase 2: 100% on 3 Aug 2026

As of 2 Oct 2026. DLD registry via datadubai.ae

First ready resale

13 Apr 2026 (phase 1)

As of 2 Oct 2026. DLD open data (Dubai Land Department via Dubai Data)

Sales registered

1,629 since Jan 2022

As of 2 Oct 2026. DLD open data (Dubai Land Department via Dubai Data)

Rent contracts registered

192

As of 3 Oct 2026. DLD open data, rent contracts (Dubai Land Department via Dubai Data)

Main contractor

PIVOT Engineering and Contracting, first 976 townhouses (awarded Jun 2022)

As of 6 Oct 2026. DAMAC press release, 27 Jun 2022

Q2 2026 completions

Costa Brava 1 was among Dubai's largest villa completions of the quarter

As of 20 Aug 2026. Khaleej Times, 20 Aug 2026 (Cushman & Wakefield)

DLD project numbers

2329 and 2330

Escrow bank

Emirates NBD

The homes in Costa Brava

Floor plan types as Dubai Land Department registers them, with built-up area in square feet.

TypeBedroomsBuilt-up areaNotes
Townhouse, mid-terrace (LTH-3B-M)3 bed2,030 sq ftPhase 2 only, on plots of about 1,550 sq ft. 87 homes.
Townhouse, mid-terrace (LTH-4B-M)4 bed2,229 sq ftGround plus one floor, plots of 1,520 to 2,247 sq ft. 599 homes, the most common type in the cluster.
Townhouse, end of terrace (LTH-5B-EM)5 bed3,111 sq ftEnd of a terrace inside a row, with one shared wall and a roof level. Plots of 1,975 to 2,603 sq ft. 228 homes.
Townhouse, row end (LTH-5B-E)5 bed3,152 sq ftRow-end or street-corner unit with a roof level, plots of 1,951 to 3,670 sq ft. 62 homes.
Villa, detached (LV-3B)5 bed plus an adrenaline room (6 rooms in DLD)4,972 sq ftGround plus one floor with a roof terrace, plots of 4,601 to 6,155 sq ft. 61 homes.
Villa, detached (LVD-1B)6 bed plus an adrenaline room, maid's and driver's rooms (7 rooms in DLD)7,251 sq ftGround plus one floor and a roof room, plots of 8,357 to 14,273 sq ft. 14 homes, all in phase 2.

Phases of Costa Brava

Dubai Land Department registers each phase as its own project, inspected and handed over on its own timetable.

Phase 1 (DLD project Costa Brava 1)

555 homes: 350 four-bed and 156 five-bed townhouses, 49 villas

100%

DLD inspection of 9 Apr 2026

Launched Dec 2021. Planned handover Jun 2025 (DAMAC); DLD completion date 29 Jul 2025.

Complete. 100% at the DLD inspection of 9 Apr 2026; first ready resale registered 13 Apr 2026

Phase 2 (DLD project Costa Brava 2)

497 homes: 87 three-bed, 249 four-bed and 134 five-bed townhouses, 27 villas

100%

DLD inspection of 3 Aug 2026

Launched Dec 2021. Planned handover Jun 2025 (DAMAC); DLD completion date 29 Jul 2025.

Complete. 100% at the DLD inspection of 3 Aug 2026; first transaction on a handed-over home 9 Jul 2026

How the market has moved

DLD registered 186 Costa Brava sales in the 12 months to 2 October 2026, up about 18% on the 12 months before, and 33 of them were ready homes. The median price per sq ft on standard mid-terrace plots rose about 14% over the same period, and 192 rent contracts had been registered by 3 October 2026.

Built from Dubai Land Department sale and lease records. Ask us for current prices of specific homes.

Living in Costa Brava

Costa Brava borrows from the Catalan coast. DAMAC built the cluster around action: ziplining, rock climbing, kayaking, paddle surfing and wave riding are on its planned list, and the brochure gives the townhouses rooftop access and garden water features.

On the master plan the cluster wraps a large lagoon below the Central Hub, between Nice and Portofino. DAMAC reported on 1 September 2026 that the community's lagoons and water bodies are being commissioned in phases, without a date for each one.

Both phases are finished at DLD inspection and people are moving in: the first lease in phase 1 started on 16 April 2026 and in phase 2 on 12 August 2026. Costa Brava 1 was one of the largest villa completions in Dubai in the second quarter of 2026.

The nearest supermarkets are just outside the community: Spinneys at DAMAC Hills Mall across Hessa Street and Carrefour in Remraam. Clinics are outside too, with the Saudi German clinic at Artesia in DAMAC Hills and Aster Clinic in Remraam.

Royal Grammar School Guildford Dubai in Tilal Al Ghaf and Jebel Ali School in DAMAC Hills are among the closest schools; none operates inside DAMAC Lagoons yet (9 October 2026). By car, DAMAC gives about 20 minutes to Expo City Dubai and 30 minutes to Downtown Dubai, and there is no bus stop inside the gates.

Get matched with homes

Tell us what you want and a licensed agent shortlists ready and off-plan homes for sale at DAMAC Lagoons for you.

What happens next

  1. A licensed agent reads your request.
  2. You get a call or WhatsApp the same working day.
  3. You receive homes that match and choose which ones to view.

What are you looking for?

Include the country code, for example +971 for the UAE.

What is it for?

By sending this form, you agree that a licensed real estate agent in Dubai may call or WhatsApp you about homes at DAMAC Lagoons, and that we keep your details for that purpose only, under the UAE Personal Data Protection Law (Federal Decree-Law No. 45 of 2021). You can withdraw your consent at any time by replying STOP on WhatsApp. Privacy policy.

Thank you, we have your request.

A licensed agent will call or WhatsApp you on the number you gave, the same working day. If you would rather start now, message us on WhatsApp.

Message us on WhatsApp now

Your details did not go through. Please try again, or message us on WhatsApp. WhatsApp

What is your Lagoons home worth?

A licensed agent compares your home with recent DLD-registered sales of the same type in your cluster and calls you with a market range. Free, with no obligation to sell.

Ask for a market appraisal

Change since launch, one common home type per cluster

Median sale price in the 12 months to 2 Oct 2026, against the first 30 days of registered sales.

Source: Dubai Land Department via Dubai Data (sales to 2 October 2026, leases registered to 3 October 2026).

Questions about Costa Brava

Something else? Ask us on WhatsApp.

Is Costa Brava ready?

Yes, at DLD inspection. Phase 1 reached 100% on 9 April 2026 and phase 2 on 3 August 2026. The first ready resale in phase 1 was registered on 13 April 2026.

What is an adrenaline room?

It is the extra room DAMAC added to the Costa Brava villas. The LV-3B villa is sold as five bedrooms plus an adrenaline room, which DLD counts as six rooms; the larger LVD-1B is sold as six bedrooms plus an adrenaline room, a maid's room and a driver's room.

Which phase has the three-bedroom townhouses?

Only phase 2. DLD records 87 three-bedroom townhouses of 2,030 sq ft there and none in phase 1.

What payment plan did Costa Brava launch with?

15/35/50: 5% on booking and 10% within a month, 35% in ten instalments up to month 30, and 50% on completion, plus the 4% DLD fee. DAMAC's website changed to 15/55/30 in June 2022.