Skip to content

Marbella at DAMAC Lagoons

Costa del Sol, the Ladies Hub

Marbella is a cluster of 609 four- and five-bedroom townhouses at DAMAC Lagoons, designed after the white streets and orange-tree squares of southern Spain. The latest DLD inspection on record puts it at 85% built, and DAMAC lists handover for 31 December 2026.

Registered

609 units with DLD

Handover

Planned for Dec 2026

Built

85%

Latest DLD inspection on record, data to 2 Oct 2026.

Picture: A DAMAC Lagoons beach and lagoon, render by DAMAC. A general view, not Marbella itself.

Aerial render of a DAMAC Lagoons beach and lagoon lined with townhouses

Marbella at a glance

Homes

609 townhouses

As of 3 Oct 2026. Dubai Land Department (DLD) land and unit registry, Dubai open data

Bedrooms

4 and 5

As of 26 Oct 2022. DAMAC launch press release, 26 Oct 2022

Launched

October 2022

As of 26 Oct 2022. DAMAC launch press release, 26 Oct 2022

Construction progress

85% (latest DLD inspection on record)

As of 2 Oct 2026. DLD project registry and inspection record (via datadubai.ae)

Planned handover

31 December 2026

As of 5 Oct 2026. DAMAC Properties website, project listing

Original DLD completion date

31 December 2025 (passed)

As of 15 Jun 2026. DLD Real Estate Projects, Dubai open data

Plot sizes

1,547 to 3,322 sq ft

As of 3 Oct 2026. Dubai Land Department (DLD) land and unit registry, Dubai open data

Payment plan on DAMAC's website

20% deposit, 40% in instalments over 15 months, 40% on completion, plus 4% DLD fee

As of 10 Nov 2024. DAMAC Properties website (archived copy, Nov 2024)

Sales registered since launch

821

As of 2 Oct 2026. DLD real estate transactions, Dubai open data

Rent contracts registered

None yet (not handed over)

As of 3 Oct 2026. DLD rent contracts (Ejari), Dubai open data

Escrow bank

Emirates NBD

As of 15 Jun 2026. DLD Real Estate Projects, Dubai open data

Status

Marbella

609 townhouses: 430 on standard mid-terrace plots, 178 on end or corner plots and 1 larger plot. DLD has not registered bedroom counts yet.

85% built

Latest DLD inspection on record, data to 2 Oct 2026

Launched Oct 2022. Planned handover 31 Dec 2026 (DAMAC website).

Not handed over, under construction. DLD's original completion date of 31 Dec 2025 has passed.

The homes in Marbella

Floor plan types as Dubai Land Department registers them, with built-up area in square feet.

TypeBedroomsBuilt-up areaNotes
Mid-terrace townhouse (LTH-4F-M)4 bedabout 2,286 sq ftGround plus one floor. Published marketing figure; DLD has no built-up area on record yet. Standard plots of 1,547 to 1,706 sq ft.
End townhouse (LTH-5F-E)5 bedabout 3,469 to 3,481 sq ftGround plus two floors. Published marketing figure; DLD has no built-up area on record yet. End or corner plots of 1,751 to 3,322 sq ft.

How the market has moved

DLD registered 48 sales in Marbella in the 12 months to 2 October 2026 (47 resales), down 60% from 119 the year before. On standard mid-terrace plots the median resale price per square foot rose 5.8% year on year, and the 30 resales matched to the first sale of the same plot sold for a median 8.9% more, about 25 months later. Source: DLD open data, as of 2 October 2026.

Built from Dubai Land Department sale and lease records. Ask us for current prices of specific homes.

Living in Marbella

Marbella takes its cues from southern Spain and Puerto Banus: small streets, white houses, flowers, fountains and terraces. At launch DAMAC described a central square modelled on the Plaza de los Naranjos with orange trees and restaurants, and an olive-tree garden suited to wedding photos.

The cluster also carries the Ladies Hub, Costa del Sol, which DAMAC announced in October 2022 with a women's gym, spa, beauty salon and meditation lounge. DAMAC's Marbella page adds a waterfall, a clubhouse, a beach, a floating amphitheatre, a wave pool and cafes. These are planned, with no published opening dates.

On DAMAC's master plan Marbella faces Monte Carlo across the Lagoon Views strip, where the Lagoon Views 1 apartment buildings stand on the Marbella side, with Malta next to it. DAMAC said in September 2026 that the community's water bodies are being commissioned in phases.

Groceries and health care are outside the gates for now: Spinneys at DAMAC Hills Mall and Viva at Artesia in DAMAC Hills, Aster Pharmacy and a Saudi German clinic, and Carrefour in Remraam (status checked 9 October 2026).

No school operates inside DAMAC Lagoons yet, though DLD has registered three school plots. Jebel Ali School in DAMAC Hills and South View School in Remraam are the closest. The community has entrances from Hessa Street and Sheikh Zayed bin Hamdan Al Nahyan Street, and RTA buses J03 and J04 stop just outside.

Get matched with homes

Tell us what you want and a licensed agent shortlists ready and off-plan homes for sale at DAMAC Lagoons for you.

What happens next

  1. A licensed agent reads your request.
  2. You get a call or WhatsApp the same working day.
  3. You receive homes that match and choose which ones to view.

What are you looking for?

Include the country code, for example +971 for the UAE.

What is it for?

By sending this form, you agree that a licensed real estate agent in Dubai may call or WhatsApp you about homes at DAMAC Lagoons, and that we keep your details for that purpose only, under the UAE Personal Data Protection Law (Federal Decree-Law No. 45 of 2021). You can withdraw your consent at any time by replying STOP on WhatsApp. Privacy policy.

Thank you, we have your request.

A licensed agent will call or WhatsApp you on the number you gave, the same working day. If you would rather start now, message us on WhatsApp.

Message us on WhatsApp now

Your details did not go through. Please try again, or message us on WhatsApp. WhatsApp

What is your Lagoons home worth?

A licensed agent compares your home with recent DLD-registered sales of the same type in your cluster and calls you with a market range. Free, with no obligation to sell.

Ask for a market appraisal

Change since launch, one common home type per cluster

Median sale price in the 12 months to 2 Oct 2026, against the first 30 days of registered sales.

Source: Dubai Land Department via Dubai Data (sales to 2 October 2026, leases registered to 3 October 2026).

Questions about Marbella

Something else? Ask us on WhatsApp.

When will Marbella be handed over?

DAMAC's website lists 31 December 2026. The latest DLD inspection on record puts construction at 85% (registry data to 2 October 2026), and DLD's original completion date of 31 December 2025 has passed.

How big are the Marbella townhouses?

The 4-bedroom mid-terrace home is marketed at about 2,286 sq ft built-up over two floors, and the 5-bedroom end home at about 3,469 to 3,481 sq ft over three floors. DLD has not recorded built-up areas yet. Plots run from 1,547 to 3,322 sq ft.

What payment plan does DAMAC show for Marbella?

No launch sheet for the October 2022 release has been found. In November 2024 DAMAC's website showed a 20% deposit, 5% at months 3 and 6, 10% at months 9, 12 and 15, and 40% on completion, with the 4% DLD fee on top.

How are Marbella resale prices moving?

On standard mid-terrace plots the median resale price per square foot was 5.8% higher in the 12 months to 2 October 2026 than a year earlier. Across the 30 resales that can be matched to a first sale, the median gain was 8.9% after about 25 months.

What is the Ladies Hub?

It is an area for women that DAMAC announced for Marbella in October 2022, with a gym, spa, beauty salon and meditation lounge near the beach. It is a planned feature; no opening date has been published.